If you already have the design or the development of your piece but do not have a mold, we invite you to get in touch with Dimoplast to be able to advise you on the integral development of your project (turnkey contract).
CONSULTANCY
Verify your own project’s viability.
VERIFY
Function
My project’s viability
Volume
Dimoplast has a 10 thousand units minimum production.
Time
Development takes between 12 to 14 weeks.
Data to quote
If you already have the design or the development of your piece but you do not have the mold yet, we invite you to contact us. In Dimoplast, we can offer you advise for a comprehensive development of your (turnkey) project.
If you already have a mold, contact us to calculate the production costs. All we need is:
Mold’s size (length, width and thickness in millimeters)
A mold’s cost depends on its size, complexity and material. Molds are machined in iron, they have very specific characteristics to guarantee the pieces quality according to the volume of production. The initial investment, generally, considers the need of producing several thousand pieces, in order to amortize this tooling’s cost.
Besides the molds figure complexity, they are made of several components that take time in their making and grinding. This is why a mold’s complete development takes 12 weeks at least.
There is wide scope of materials that might be used in the injection process. The right plastic selection is according to the appearance and function the piece is meant to have. Some plastics are capable of resisting physic efforts, some have an excellent appearance and some others comply with engineering norms and requirements. Costs vary accordingly.